This thread is simply for documentation purposes just to make sure if anything goes wrong that we have everything written down. I ask that you please do not post in this thread.
I'll be doing a box build for a local by the name of Shane. He is purchasing a box for his Massive CW15. The box specs will be ~3.2 cubes @ 38hz, assembled with a birch/cabinet ply and then wrapped in black carpet.
The total for this box is $115, with materials estimated to be around $65 and labor of $50. Shane has agreed to meet up with me and pay the $65 up front to pay for the materials, and he will give me the remaining $50 once the box is done. We have scheduled to exchange the $65 on Saturday the 14th at 10:00 AM.
I'll also be snapping pictures of the progress on this box so Shane can see the quality of the build as it progresses. Once the box is done, we will arrange a time to exchange the box and the remaining $50.
I'll be doing a box build for a local by the name of Shane. He is purchasing a box for his Massive CW15. The box specs will be ~3.2 cubes @ 38hz, assembled with a birch/cabinet ply and then wrapped in black carpet.
The total for this box is $115, with materials estimated to be around $65 and labor of $50. Shane has agreed to meet up with me and pay the $65 up front to pay for the materials, and he will give me the remaining $50 once the box is done. We have scheduled to exchange the $65 on Saturday the 14th at 10:00 AM.
I'll also be snapping pictures of the progress on this box so Shane can see the quality of the build as it progresses. Once the box is done, we will arrange a time to exchange the box and the remaining $50.